Protect the Floor Before Touch-Up Work Begins
Small repairs can still bring ladders, tools and materials into a finished space. Before touch-up work starts, covering the work area helps reduce the risk of marks and scratches on the floor and makes the area easier to keep tidy.
Floor protection for the details that matter
In this example, Novafloor Protection sheets cover the floor beneath a stepladder and across the working area. The protection extends beyond the immediate repair spot, where people and equipment may move during the job.
When planning a touch-up, consider the route for tools and materials as well as the spot being repaired. Lay the protective sheets before work begins, keep adjoining sections in place, and remove them once the work area is clear. A little preparation helps protect the finished floor while the small details are attended to.
See the floor protection in place
View the original Novafloor Protection post and its project photos.
Plan protection for your next project
Tell us what kind of floor you need to protect, the approximate area and the work involved. We can discuss a suitable Novafloor Protection option with you.
Koma Supply Sdn Bhd Lot 776-B, Jalan Subang 4,Taman Perindustrian Sungai Penaga,
47500 Subang Jaya, Selangor, Malaysia. WhatsApp Us