Language: EN | BM |

Floor Protection Before Touch-Up Work | Novafloor

Floor Protection Before Touch-Up Work | Novafloor

  3 more

Protect the Floor Before Touch-Up Work Begins

Small repairs can still bring ladders, tools and materials into a finished space. Before touch-up work starts, covering the work area helps reduce the risk of marks and scratches on the floor and makes the area easier to keep tidy.

Floor protection for the details that matter

In this example, Novafloor Protection sheets cover the floor beneath a stepladder and across the working area. The protection extends beyond the immediate repair spot, where people and equipment may move during the job.

When planning a touch-up, consider the route for tools and materials as well as the spot being repaired. Lay the protective sheets before work begins, keep adjoining sections in place, and remove them once the work area is clear. A little preparation helps protect the finished floor while the small details are attended to.

Plan protection for your next project

Tell us what kind of floor you need to protect, the approximate area and the work involved. We can discuss a suitable Novafloor Protection option with you.

Koma Supply Sdn Bhd
Lot 776-B, Jalan Subang 4,
Taman Perindustrian Sungai Penaga,
47500 Subang Jaya, Selangor, Malaysia.
WhatsApp Us

03 Nov 2026